Helicopter 225x169The Tahuehueto Project consists of 28 mining concessions grouped into five non-contiguous blocks that total approximately 7,492 hectares. Tahuehueto lies within the prolific Sierra Madre Mineral Belt, which hosts a series of historic and producing mines and most of Mexico's active exploration and development projects.  The project is situated approximately 100 km southwest of silver mines in the Guanacevi region, and about 25 km north of the silver mines at Topia.

On December 6, 2016 Telson announced the results of a Pre-Feasibility Study ("PFS") completed by Metal Mining Consultants Inc. Key findings from the report included:

 

 

SUMMARY OF ECONOMIC RESULTS FROM 2016 PRE-FEASIBILITY STUDY
Item  
Average Annual Revenues ("EBITDA") US $16.6 million
NPV @ 8% Annual Discount Rate (Post Tax) US $69.9 million
Internal Rate of Return (IRR) 33%
Payback Period 3 years
Mine Life 21 years
Average Cost per Tonne (incl mining, processing and G&A) US $59.24
Average Cost per Ounce AuEq US $305.00
METAL PRICES
Gold US$ 1,180.00/oz
Silver US$ 16.70/oz
Lead US$ 0.87/lb
Zinc US$ 0.92/lb
Copper US$ 2.65/lb

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Access to the Tahuehueto property is by road, about 9 hours from Durango City, or by fixed-wing aircraft to a nearby landing strip. The project site is remote, with only a few villages in this portion of the Municipality of Tepehuanes.  Recent initiatives of Mexico's Durango state government provide Telson with the possibility of an alternative and much improved access route. A new two lane paved highway nearing completion will connect Northwestern Durango State to Sinaloa State near Culiacan. This new highway passes close to Topia near Canelas and exits the Sierra Madre Mountains at Tamazula, a mere 45 km from Culiacan, the capital of Sinaloa State. In order to connect to this new highway, Telson will need to construct a new access road of approximately 18 km connecting to existing road infrastructure close to Topia. This would provide direct access to the new highway thereby markedly improving the access to the project.

OWNERSHIP

Telson Resources Inc. controls 100% of the Tahuehueto Project through its 99% owned Mexican subsidiary, Real de la Bufa S.A. de C.V.. Exploration services and project management are provided by another wholly owned Mexican subsidiary, Sierra Soleada S.A. de C.V.

MINERALIZATION

Since acquiring the rights to the Tahuehueto Project in 1997, Telson Resources has identified at least 12 polymetallic zones hosted within a structurally controlled epithermal system that has been traced for more than six kilometres. Mineralization at Tahuehueto consists of epithermal, low-sulfidation, polymetallic Ag-Au veins and breccias with copper, lead and zinc. This setting is common within the gold-silver metallogenic province of the Sierra Madre Occidental and accounts for much of the historic gold and silver production from the province.

METALLURGICAL TESTING

Telson announced on April 20, 2010 the results of recently completed metallurgical testing performed by Westcoast Mineral Testing Inc. The table below provides a summary of these tests. To read the complete news release <click here>.

 

Zone Test Rougher Recovery %
Au Ag Cu Pb Zn
Cinco de Mayo 10-06 91.5 91.4 88.6 98.8 97.2
El Creston 10-07 83.4 78.7 81.6 87.7 53.2
El Perdido 10.08 82.5 74.2 84.8 93.6 64.9
El Catorce 10-09 87.2 83.5 73.9 98.3 87.7
Arithmetic Average   86.2 82.0 82.2 94.6 75.8

 

OVERVIEW

Mr. Ralph Shearing, President of the Company states "The delivery of these robust Preliminary Economic Assessment numbers is one of the most significant milestones in the history of the Company and clearly demonstrates the potential economic viability of the Tahuehueto Project. It is important to note that this economic assessment was calculated from the resource as outlined in the most recent 2009, NI 43-101 compliant mineral resource. Exploration potential still exists within the unexplored portions of the current resource structures, both along strike and down dip, as well as in the many other separate mineralized structures known to occur, but yet unexplored, within the project concessions. Additional upside potential is also contained within the difference between the three-year rolling average metal prices used in the PEA and the current strong precious metal prices for gold and silver. There is very little doubt in my mind that with additional exploration and development the projected 11 year mine life outlined in the PEA could be extended"

 

 

 