Telson resources

Telson resources

Telson resources

TSX.V: TSN
OTCBB: SOHFF
Last: 0.335
Volume: 3500
Delayed: 15 - 20 minutes
  • Home
  • Company
      • Corporate Profile
      • Our Team
      • History
      • Corporate Governance
          • ESTMA
          • Health and Safety
          • Environmental Policy
          • Community Initiatives
          • Committees
          • Corporate Responsibility
  • Projects
      • Tahuehueto Project
          • Overview
          • Reserves and Resource Summary
          • Technical Reports
          • Maps and Drill Plans
          • Gallery
          • FAQs
      • Campo Morado Mine
          • Overview
          • Resource Summary
          • Technical Reports
          • Maps and Drill Plans
          • Gallery
          • FAQs
  • Investors
      • Why Invest?
      • News
          • News 2017
          • News 2016
          • News 2015
          • News 2014
          • News Archive
      • Share Structure
      • Financials
      • Presentations
      • Analyst Coverage
      • Insider Trading
      • SEDAR Filings
      • FAQs
  • Media Center
      • Image Gallery
      • Downloads
      • Events Calendar
      • Useful Links
  • Contacts
      • Employment Opportunities
  • Home | 
  • Projects | 
  • Tahuehueto Project | 
  • Overview
Overview

Tahuehueto lies within the prolific Sierra Madre mineral belt, which hosts a series of historic and producing mines and most of Mexico’s active exploration and development projects. The project is situated approximately 100 kilometers southwest of silver mines in the Guanacevi region and about 25 kilometers north of the silver mines at Topia. 

Consisting of 28 mining concessions grouped into five non-contiguous blocks that total approximately 7,492 hectares the Tahuehueto is in an advanced stage of development with mine construction plan during 2017 and targeting commercial production within the first quarter of 2018. Telson Resources Inc. owns 100% of the project through a 99.9% share ownership in its Mexican subsidiary company.

Significant exploration upside potential exists both on the existing reserve/resource explored structures along strike and down dip of the known mineralization which is open in all directions as well as within numerous other mineralized but unexplored structures known to occur within the core 700 ha concession area. Further exploration potential exists outside of the core area where Telson controls approximately an additional 6700 hectares of concessions. Telson’s concessions cover about 80% of the mineralized District Tahuehueto, and there is a significant amount of prospective ground within this government recognized geological district. 

Telson’s plan is to get into production with the reserves outlined in the core 500 ha area, continue to expand the reserves on structures where there are defined reserves and resources, and start to look at our less explored structures within this core 500 ha area. A Greenfields type of exploration program will also be designed and implemented after production is achieved to explore the regional District potential within Telson’s concession area.

NI 43-101 Pre-Feasibility Study, Mineral Reserve Estimate And Updated Mineral Resource Estimate

In January 2017, Telson announced the results of a NI 43– 101 compliant Prefeasibility Study (the “PFS”) for its Tahuehueto Project located in Durango, Mexico. A summary of the results from this study are found in the table below.

SUMMARY OF ECONOMIC RESULTS FROM 2017 PRE-FEASIBILITY STUDY
Average Annual Revenues ("EBITDA") US $16.7 million
NPV @ 8% Annual Discount Rate (Post Tax) US $77 million
Internal Rate of Return (IRR) 36%
Payback Period 3 years
Mine Life 21 years
Average Cost per Tonne (incl mining, processing and G&A, smelting, refining & royalties) US $91.26
Average Cost per Ounce AuEq US $494.95
METAL PRICES
Gold US$ 1,180.00/oz
Silver US$ 16.70/oz
Lead US$ 0.87/lb
Zinc US$ 0.92/lb
Copper US$ 2.65/lb

 

Recent developments at Tahuehueto

On January 23, 2017, the Company released its most recent NI-43-101 compliant report, a Pre-Feasibility Study (“PFS”) completed by the fully independent mining engineering firm of Metal Mining Consultants Inc. based out of Colorado, USA. The study evaluated an owner-operated 790 tpd underground mine with mill feed being processed in a 550 tpd comminution circuit consisting of primary and secondary crushing, grinding in a single ball mill followed by three flotation circuits producing lead, copper and zinc concentrates which will be trucked from site for smelting and refining. The report provided robust economics on the project including a post-tax IRR of 36% and an NPV using an 8% discount of US$77 million with a 21 year mine life. Telson is currently evaluating the economics of a 12 year mine life with increased the tonnage throughput of an expanded mill and mining operation. (Please insert a link to PFS news release here)

On February 16, 2017, the Company announced the completion of an agreement for the acquisition of a sulfide flotation mineral processing facility, (the Tahuehueto Mineral Processing Facility”). The equipment purchased consists of the majority of milling equipment necessary, once installed and operational, to process Tahuehueto ore at an estimated capacity as envisioned within the PFS and Telson management assesses the purchased Tahuehueto Mineral Processing Facility to be capable of processing up to 1000 tonnes of ore per day with the addition of only a small amount equipment. A complete list of the milling and processing equipment purchased can be viewed <here>.

On February 23, 2017, Telson reported the final sale results from its 3500 tonne industrial scale bulk sample collected from the El Creston zone at Tahuehueto, trucked it 270 km to a toll mill located Guanacevi, Durango, and processed producing 259 tonnes of zinc concentrate and 201 tonnes of lead concentrate which were sold generating cash receipts of USD $1.47 million. (Please insert blank two news release here)

Telson Resources controls 100% of the Tahuehueto Project through a 99%-owned subsidiary, and acquired the district-scale property for its potential to host multiple deposits and discoveries. The project lies within the Sierra Madre mineral belt, which hosts most of Mexico’s producing mines and active exploration and development projects, and has geological similarities

to epithermal deposits being exploited in nearby mining districts. In addition to vast geological potential, Mexico offers the advantages of social and political stability and a favorable investment climate.

Telson Resources is managed by a team experienced in mining engineering, metallurgy and geology plus other mining professionals employed and committed to adding value to Tahuehueto and increasing shareholder returns through cost-effective programs conducted in a socially and environmentally progressive manner. Management has set a targeted goal of reaching commercial production at Tahuehueto near the end of 2017. Initial production is targeted at 550 tonnes per day and management intends to double that production during the first year of mining operations.

 

 

 

let’s get started

Call us (604) 684-8071
or
click below to email us

get started
Stay Up To Date

Please subscribe to our news dissemination list to receive the latest updates and news

Follow us
Telson resources ©2017 Privacy Policy